Environmental Sector
Project Name: Impermeable Lining for Sedimentation Pond of SLTEC Coal-fired Power Plant
Location: Calaca, Batangas
Client: AC ENERGY (AYALA COMPANY)
RTerra delivered a complete solution to the Calaca Coal-fired Power Plant by supplying and installing 9,000 sqm of HDPE liner at 1.5 mm in thickness over 5,000 sqm of non-woven geotextile as base layer to provide an impermeable lining and containment for the sedimentation pond. The pond is used as holding area for wastewater of the plant prior to its release to the environment.